Please help and show steps Waterways Problem 17 b-c Direct labor or machine hours may not be the appropriate cost driver for overhead in all

Please help and show steps
image text in transcribed
image text in transcribed
image text in transcribed
Waterways Problem 17 b-c Direct labor or machine hours may not be the appropriate cost driver for overhead in all areas of manufacturing due to the complexities of many manufacturing processes. Many companies use activity-based costing (ABC) which uses multiple drivers (items that consume resources) rather than just one driver to apply overhead to their activities. With ABC, a company can use a cost driver that has a direct cause/effect relationship in its applied overhead costs. Waterways looked into ABC as a method of costing because of the variety of items it produces and the many different activities in which it is involved. The activities listed below area sample of possible cost pools for Waterways. Assembling Payroll Billing Plant supervision Digging trenches Product design Janitorial Purchasing materials Machine maintenance Selling Machine setups Testing Molding Welding Packaging Using the following information, determine the overhead rates and the actual cost assigned for each of the activity cost pools in a possible ABC system for Waterways. (Round answers to 2 decimal places, e.g. 12.25.) WATERWAYS CORPORATION Expected Use of Cost Activity Cost Estimated Drivers per Pools Cost Drivers Overhead Activity Irrigation installation Labor cost $2,060,910 13,470 Machining (all machine use) Machine hours 1,830,800 36,616,000 Customer orders Number of orders 32,500 2,500 Shipping none (direct) N/A N/A Design Cost per design 776 8 Selling Number of sales calls 358,400 22,400 Actual Use of Drivers 13,453 36,617,000 2,467 traced directly 7 22,620 WATERWAYS CORPORATION Activity Based Actual Activity Cost Overhead Cost Pools Rates Assigned Irrigation installation Machining (all machine use) Customer orders $ Design Selling How would you classify each of the following activities by level-unit level, batch level, product level, or facility level? Testing of products (if all items are tested) Testing of products (if all items are not tested) Designing new products Packaging Molding Assembling Depreciation Machine maintenance Advertising Equipment setups Electricity required to run equipment Requisitioning materials

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Money And Banking

Authors: Robert E. Wright, Vincenzo Quadrini

1st Edition

0982043082, 9780982043080

More Books

Students also viewed these Accounting questions

Question

Identify the job expectancy rights of employees.

Answered: 1 week ago