please help. dont know 10-12 need asap
Check my work Required information The Foundational 15 (LO2-1, LO2-2, LO2-3, LO2.4) The following information applies to the questions displayed below.) Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturing departments-Molding and Fabrication. It started, completed, and sold only two jobs during March Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and (o data and questions relate to the month of March): Holding Fabrication Total Estimated total machine-hours uned 3.000 1,800,000 Detinated total fixed manufacturing overhead $ 12,000 $18,000 30,000 Timated variable manufacturing overhead per $ 1.40 $ 2.30 machine-hour JOP $ 15,600 $ 25,200 Job 19,600 $9.000 Direct materiais Direct Labor cost Actual machine-hour wedi Molding Fabrication Total 2,080 720 2.800 960 1.040 2.000 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 1 to 9, assume that Sweeten Company uses departmental predetermined overhead rates with machines hours as the allocation base in both departments and Job Pincluded 20 units and Job included 30 units. For questions 10 to 15, assume that the company uses a plantwide predetermined overhead rate with machine-hours as the allocation base sweeter Company had no underapplied or overapplied manufacturing overhead costs during th Required: For questions 1 to 9, assume that Sweeten Company uses departmental predetermined overhea hours as the allocation base in both departments and Job P included 20 units and Job Q include 10 to 15, assume that the company uses a plantwide predetermined overhead rate with machine base. Foundational 2-10 (Algo) 10. What was the company's plantwide predetermined overhead rate? (Round your answer to 2 decim Predetermined overhead rate per MH 10 11 12 15 MacBook Ain questions 1 to 9, assume that Sweeten Company uses departmen hours as the allocation base in both departments and Job P included 10 to 15, assume that the company uses a plantwide predetermined base. Foundational 2-12 (Algo) 12. If Job P included 20 units, what was its unit product cost? (Do not round nearest whole dollar.) Unit product cost