Question
Please help me with this final project. thank you FINAL PROJECT FOR MGT4203 - PPM Project Overview: The Algonquin College e-Bike_ACV2 project aims to build
Please help me with this final project. thank you
FINAL PROJECT FOR MGT4203 - PPM
Project Overview:
The Algonquin College e-Bike_ACV2 project aims to build a functional prototype e-bike with a location tracker and remote locking capability. The e-bike will be designed for use in the city of Ottawa, Canada, and will be equipped with GPS tracking technology to allow users to locate their bikes easily. The remote locking feature will allow users to lock and unlock their bikes using a mobile app, ensuring the safety and security of the bike. Our goal is to do a functional and reliable prototype that can be used in all seasons and all terrains.
Project Objectives:
To design and build a prototype e-bike with a location tracker, remote locking capability and able to drive in all seasons and all terrains in Ottawa Gatineau Area. The emphasis is on the Procurement Management Processes but includes the overall project management exercise.
- Designing
Your organization (You and Your team) have designers (in-house Activity)
- Parts
You don't have part manufacturing in-house (need to be procured)
- Software
For Software you have in-house software team which is already overloaded (decision is to buy)
- Electrical/Electronic Components
You don't have in-house expertise in Electrical or Electronics, therefore, need to be procured from Third party.
- Prototype Assembly
You have the capability to assemble the final product in-house.
NOTE:
This project will be used throughout the term, and we will build the components of the project after learning in our classes. The final project submission will be the executive summary of all the work which we will be doing as in-Class Assignments or discussed on Discussion Boards.
Executive Summary
MGT4203
Project Procurement Management
(Project Name)
(Dated)
Team # N
Team Member # | Team Members Names |
Team Member # 1 | |
Team Member # 2 | |
Team Member # 3 | |
Team Member # 4 | |
Team Member # 5 | |
Team Member # 6 |
Algonquin College Ottawa
Contents
1. ABSTRACT/EXECUTIVE SUMMARY.3
2. PURPOSE.3
2.1. Background.3
3. Project Completion Work.3
3.1. Work Completed.3
3.2. Outstanding Issues.3
4. Project Procurement Performance Assessment.4
4.1. Baseline.4
4.3. Project Procurement Deliverables.4
4.4. Project Procurement Costs, Schedule.4
4.5. Stakeholders/Clients.4
4.6. Project Procurement Scope Changes.4
4.7. Overall Project Procurement Assessment.4
5. Lessons Learned.5
APPENDIX I - Close-Out Document Checklist.6
ABSTRACT/EXECUTIVE SUMMARY
Summarize the key points of the report. It should restate the purpose of the report, highlight the major points of the report, describe all results, conclusions, and recommendations from the report. (Select this whole text and start typing)
PURPOSE
Give the reason why this report is being written, what was the target and why (Select this whole text and start typing)
- Background
Insert sufficient business and project background information to describe why the project was required and what outcomes it was intended to produce. This text may include the original problem or opportunity statement or project scope and/or Procurement scope. (Select this whole text and start typing)
Plan Procurement Management:
- Project Requirement Traceability Matrix Completed
Insert the completed Requirement Traceability Matrix (Select this whole text and start typing)
- Procurement Statement of Work
Insert the high-level procurement statement of work (Select this whole text and start typing)
- Procurement/Change Management Strategy
Insert team procurement strategy (Select this whole text and start typing)
- Make and Buy Decision
Insert Make and buy decisions here (Select this whole text and start typing)
- Procurement Risk Management Process
Insert the Procurement Risk management process here (Select this whole text and start typing)
- Procurement Schedule Management Process
Insert the Procurement Schedule management process and a time line (Gant Chart or Roadmap) here (Select this whole text and start typing)
- Procurement Cost Management Process
Insert the Procurement Cost management process here (Select this whole text and start typing)
- Procurement Quality Management Process
Insert the Procurement Quality management process here (Select this whole text and start typing)
- Procurement Change Management Process
Insert the Procurement Change management process here (Select this whole text and start typing)
- Source Selection Criteria
Insert the Source Selection Criteria here (Select this whole text and start typing)
- Independent Cost Estimate Strategy
Insert the Independent Cost Estimate Strategy here (Select this whole text and start typing)
- Bid Documents Review Process
Insert the Bid Document Review process here (Select this whole text and start typing)
Execution
- Work Completed
Project Procurement Performance Assessment Provide a summary table from the Project Change Procurement Register and/or from the Change Request Board minutes. Identify and assess the project Procurement changes made during the project as approved in Change Requests if any.> (Select this whole text and start typing) Lessons Learned A suggested approach to structuring this section is to determine the main categories that ought to be analyzed and to divide each of the chosen categories into two sections: lessons learned and recommendations. (Select this whole text and start typing) Present this section in a table such as the one shown below.> ID Lesson Learned Recommendation Reference
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started