Please help with accounting. DATA: QUESTION 1: Exhibit 1 Resource Design/Drafting Engineering Fabrication Powder coating Scheduling General factory Existing Capacity Available and Used and Capacity

Please help with accounting.

DATA:

image text in transcribed

image text in transcribed

QUESTION 1:

image text in transcribed

Exhibit 1 Resource Design/Drafting Engineering Fabrication Powder coating Scheduling General factory Existing Capacity Available and Used and Capacity Costs Current capacity and usage (annual) Practical Purchased Cost Used Capacity Cost Driver of Capacity Capacity 20,000 design hours $ 500,000.00 19,500 15,000 engineering hr $ 750,000.00 14,750 40,000 parts $ 30,000.00 39,000 400,000 square feet $1,800,000.00 210,000 750 job setups $ 756,000.00 640 80,000 machine hrs $2,400,000.00 64,000 Exhibit 2 Resource needs for potential new products Pool shade Trellis Cost Driver requirements requirements 30 20 4 Resource Design/Drafting Engineering Fabrication Powder coating Scheduling General factory 2 22 40 design hours engineering hrs parts square feet job setups machine hrs 170 1600 1 80 1 10 Selling price per unit Material cost per unit Pool shade 42,500.00 18,750.00 Trellis 4,300.00 700.00 Desired profit on sales Demand Pool shades Demand Trellises 0.30 120 60 Target cost 1) Compute the target cost for the two proposed products. Selling price Desired Profit Target cost of Pool Shades Target cost of Trellises

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions