Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Please help with all parts!! :) Required information Problem 08-3A Flexible budget preparation; computation of materials, labor, and overhead variances; and overhead variance report LO
Please help with all parts!! :)
Required information Problem 08-3A Flexible budget preparation; computation of materials, labor, and overhead variances; and overhead variance report LO P1, P2, P3, P4 (The following information applies to the questions displayed below.) Antuan Company set the following standard costs for one unit of its product. Direct materials (3.0 Ibs. @ $4.00 per Ib. ) Direct labor (1.7 hrs. @ $11.00 per hr.) Overhead (1.7 hrs. @ $18.50 per hr.) Total standard cost $12.00 18.70 31.45 $62.15 The predetermined overhead rate ($18.50 per direct labor hour) is based on an expected volume of 75% of the factory's capacity of 20,000 units per month. Following are the company's budgeted overhead costs per month at the 75% capacity level. Overhead Budget (75% Capacity) Variable overhead costs Indirect materials $ 15,000 Indirect labor 75,000 Power 15,000 Repairs and maintenance 30,000 Total variable overhead costs Fixed overhead costs Depreciation-Building 24,000 Depreciation-Machinery 71,000 Taxes and insurance 18,000 Supervision 223,750 Total fixed overhead costs Total overhead costs $135,000 336,750 $ 471,750 The company incurred the following actual costs when it operated at 75% of capacity in October. $ 188,600 224,000 Direct materials (46,000 Ibs. @ $4.10 per lb.) Direct labor (20,000 hrs. @ $11.20 per hr.) Overhead costs Indirect materials Indirect labor Power Repairs and maintenance Depreciation-Building DepreciationMachinery Taxes and insurance Supervision Total costs $ 41,450 176,850 17,250 34,500 24,000 95,850 16,200 223,750 629,850 $1,042,450 Problem 08-3A Part 1&2 Required: 1&2. Prepare flexible overhead budgets for October showing the amounts of each variable and fixed cost at the 65%, 75%, and 85% capacity levels and classify all items listed in the fixed budget as variable or fixed. ANTUAN COMPANY Flexible Overhead Budgets For Month Ended October 31 Flexible Budget Flexible Budget for Variable Amount Total Fixed 65% of 75% of 85% of Cost capacity capacity capacity per Unit Sales (in units) Variable overhead costs $ 0.00 0 0 Fixed overhead costs 0 0 0 Total overhead costs Problem 08-3A Part 3 3. Compute the direct materials cost variance, including its price and quantity variances. (Indicate the effect of each variance by selecting for favorable, unfavorable, and No variance.) Actual Cost Standard Cost 0 $ $ O $ 0 0 O Problem 08-3A Part 4 4. Compute the direct labor cost variance, including its rate and efficiency variances. (Indicate the effect of each variance by selecting for favorable, unfavorable, and No variance. Round "Rate per hour" answers to two decimal places.) Actual Cost Standard Cost $ 0 $ O $ 0 0 Problem 08-3A Part 5 5. Prepare a detailed overhead variance report that shows the variances for individual items of overhead. (Indicate the effect of each variance by selecting for favorable, unfavorable, and No variance.) ANTUAN COMPANY Overhead Variance Report For Month Ended October 31 Expected production volume Production level achieved Volume variance Flexible Budget Actual Results Variances Fav. / Unfav. Variable costs Fixed costs Total overhead costsStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started