Please make predecessor and successor activites with time frame for these activities of MSP Project. ABC Hydroponics Initiation Project identification and Concept Development Greenhouse feasibility
Please make predecessor and successor activites with time frame for these activities of MSP Project.
ABC Hydroponics |
Initiation |
Project identification and Concept Development |
Greenhouse feasibility study |
Stakeholder analysis |
Project charter development |
Project team formation |
Risk management plan |
Climate and crop assessment |
Prepare financial plan |
Procurement planning |
Communication plan |
Project kickoff |
Approved project charter |
Site Preparation |
Site survey and assessment |
Site clearing and grading |
Soil stabilization |
Utilities installation |
Access roads and parking |
Site security measures |
Environmental considerations |
Permitting and regulatory compliance |
Greenhouse Construction, Interior System, and Solar Panel System Planning |
Requirements gathering |
Conceptual design |
Detailed design |
Structural analysis |
Material Selection |
System Integration |
Permitting and regulatory compliance |
Hire contractors for greenhouse construction |
Civil works and engineering planning |
Architectural plan |
Structural plan |
Electrical plan |
HVAC plan |
Plumbing plan |
Sprinkler system design |
Interior system planning |
Heating and cooling design |
Water system and irrigation design |
Climate and irrigation control design |
Lighting design |
Automation and measuring design |
Apply for water connection |
Apply for electrical connection |
Crop Selection |
Market demand analysis |
Crop feasibility |
Cost and revenue projection analysis |
Selecting Crops |
Crop management plan |
Procurement of seeds |
Procurement of Materials and Equipment |
Identification of materials and equipment |
Sourcing suppliers |
Obtaining quotes and negotiating contracts |
Placing orders |
Purchase building materials (formworks) |
Purchase materials (electrical works) |
Purchase materials (plumbing works) |
Purchase HVAC equipment |
Purchase materials for NFT system |
Purchase materials for Kratky System |
Purchase gardening tools, seeds, fertilizers, coco peat |
Purchase lighting, automation, and measuring equipment |
Tracking and managing deliveries |
Conducting quality control and checks |
Managing inventory |
Handling logistics |
Greenhouse construction (external and internal) |
Civil works |
Excavation |
Foundation construction |
Greenhouse frame construction |
Wall and roof panels installation |
Greenhouse cover (fiber glass or poly sheets) |
Doors, vents and louvers |
Electrical installation |
HVAC works |
Plumbing installation |
Insulation and climate control |
Water system and irrigation |
Lighting fixtures |
Site inspection (final inspection) |
Occupancy permit |
Status reports |
Installation of Solar Panel System |
Installation of panels |
Installation of electricals |
Installation of battery |
Testing |
Integration |
Training for Operation and Maintenance |
Development of training materials |
Training sessions |
Hands-on training |
Ongoing support (Q&A may arise during operation and maintenance) |
Documentation (Outlining the procedures) |
Review and evaluation |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started