Question

1 Approved Answer

Please provide a CFD (Cash Flow Diagram) in addition to your solution. Thank You. Problem-2 A chemical engineer is considering two styles of pipes for

Please provide a CFD (Cash Flow Diagram) in addition to your solution. Thank You.

image text in transcribed

Problem-2 A chemical engineer is considering two styles of pipes for moving distillate from a refinery to the tank farm. A small pipeline will cost less to purchase (including valves and other appurtenances) but will have a high head loss and, therefore, a higher pumping cost. The small pipeline will cost $1.7 million installed and will have an operating cost of $12,000 per month. A larger-diameter pipeline will cost $2.1 million installed, but its operating cost will be only $8000 per month. Which pipe size is more economical at an interest rate of 1% per month on the basis of an annual worth analysis? Assume the salvage value is 10% of the first cost for each pipeline at the end of the 10-year project period. Answer: CFD

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions