Question
Please show me how to answer this question, Thanks! Q11. Oliver Systems produces two different products (Product 1 and Product 2) , is considering whether
Please show me how to answer this question, Thanks!
Q11.
Oliver Systems produces two different products (Product 1 and Product 2) , is considering whether to use ABC versus Traditional costing. For ABC costing Parker would use three different activities to allocate manufacturing overhead: Design, which uses Engineering Hours as an activity driver; Machining, which uses machine hours as an activity driver; and Inspection, which uses number of batches as an activity driver.
If Oliver used traditional costing, they would use machine hours to allocate the cost. The cost of each activity and usage of the activity drivers are as follows:
Activity/ (Driver) | Total estimated cost | Usage by Product 1 | Usage by Product 2 |
Design (engineering hours) | $118000 | 130 | 210 |
Machining (machine hours) | $238000 | 1530 | 1350 |
Inspection (Batches) | $78000 | 70 | 60 |
Using traditional costing, what is the total manufacturing overhead that will be allocated to Product 1?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started