Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Please show work and explain with full details!!! Questions 1 through 7 are related. 1. 999?? l 9' 999?? :5 EDP-PF! EDP-PF! Refer to the

Please show work and explain with full details!!!

image text in transcribedimage text in transcribed
Questions 1 through 7 are related. 1. 999?? l\" 9' 999?? :5 EDP-PF!\" EDP-PF!\" Refer to the attached article titled \"Steelmakers Gird for a Downturn". The photograph shows a steel mill at Sparrows Point, Maryland \"which was closed last month by RG Steel when it led for bankruptcy\". As a result of the bankruptcy ling, the steel mill: has exited the industry. has shutdown but not exited the industry. has increased the demand for steel. should re-open if the price of steel decreases. none of the above answers is correct. The article also informs us that \"prices have fallen approximately 12% since February to $723 a ton for the benchmark hot rolled steel, from $827 a ton\". It also provides the following information: \"Capacity utilization the tonnage produced compared with the actual production capacityhas fallen to 76% from 80%." Changes to capacity utilization represent changes in production or output. If the changes to the steel industry are attributable to changes in demand, what is the \"arc\" Price Elasticity of Supply over the range of the supply curve for the information given using the midpoint method? [Think carefully about the percentage change in quantity.] 0.33. 0.38. 0.57. 2.40. 3.00. One analyst believes "at least 100 million metric tons of global steelmaking capacity,about 6.5% of global production needs to be eliminated to keep prices firm". If 100 million tons equals 6.5% of current output and current output is 76% of capacity utilization, what is the estimated capacity output for the steel industry? 1,169 million tons 1,538 million tons 1,893 million tons 2,024 million tons 2,165 million tons The capacity output calculated in the previous question would be the capacity output: in the "short term" in the "long term" in both the \"short and long term\" in neither the "short nor long term\" none of the above answers is correct as??? as??? 7' 99??? Given the information in the previous questions and your answer to question 58, the estimated current production or output of the steel industry would be: 1,645 million tons 1,538 million tons 1,437 million tons 1,169 million tons 888 million tons If 100 million metric tons of global steelmaking capacity is eliminated then: the demand curve for steel will shift down or to the left. the demand curve for steel will shift up or to the right. the supply curve will shift down or to the right. the supply curve will shift up or to the left. both answers a and d are correct. The article notes that current production has fallen to 76% of capacity from 80% of capacity in February while, \"prices have fallen 12% since February to $723 a ton for the benchmark hot rolled steel, from $827 a ton". With the information provided in the article and the calculations from previous questions and knowing the changes in the industry were triggered by a shift in demand, an estimate of a single factor linear supply function for the steel industry would be: 05 = 975 + .78 P. 05 = 613 + 1.28 P. Q; = 1,200 + .78 P. 03 = 1,969 + 1.28 P. 05 = 829 + .98 P

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Reporting And Analysis

Authors: Lawrence Revsine, Daniel Collins

5th Edition

0078110866, 978-0078110863

More Books

Students also viewed these Economics questions

Question

What types of measures do data come in?

Answered: 1 week ago