please show work
Physical Flow, Equivalent Units; Unit Costs, No Beginnino WiD inventory, Activity-Based Costing, DBC Mckay, Inci, produces a subassembly used in the production of hydraulic cylinders. The subassemblies are produced in three departments: Plate Cutting, Rod Cutting, and Weldin applied using the following drivers and activity rates: During the first quarter, the Plate Cuttino Department used 29.700 hours (direct, indirect, and machine hours) to produce the quarter's output, Other quarterly data for the Plate C. 1. Prepare a physical flow schedule, If an answer is zero, enter " 0 ". c. The cost assigned to units in ending inventory. Round your answers to the nearest cent. Feedback Theck My Work 4 c. The cost of goods (services) transferred out is the unit cost multiplied by the units completed. The cost of EWIP is costs are transferred to the next process (department) by debiting the WIP account of the process (department) receivi 5. Suppose the plant manager asked the following questions: a. What is the actual cycle time for the conversion cost output for the plate subassembly (round to four decimal places)? hours per unit b. What is the conversion cost rate for the first quarter, using total conversion costs and total time (round to the nearest cen per hour c. What is the conversion cost per unit, using duration-based costing (round to the nearest cent)? 1 d. Accordino to production engineering, if efficiency were increased to an ideal level, then the cycle time should be 0.20 hours. 7 Check My Work 1. A physical flow schedule shows the units to account for and what happened to them. 2. Calculate equivalent units of production for: 3. Calculate unit costs for the following. Round your answers to the nearest cent. 7 Check My Work 1. A physical flow schedule shows the units to account for and what happened to them. 2. Calculate equivalent units of production for: 3. Calculate unit costs for the following. Round your answers to the nearest cent. a. Direct materials per unit b. Conversion costs X per unit c. Total manufacturing per unit 4. Provide the following information: a. The total cost of units transferred out Feedback Theok My Work 2. The equivalent units schedule measures the output of the period. A fully completed unit is counted as a unit of outp 3. Unit cost = Costs of the period Output of the period 4 a. The cost of goods (services) transferred out is the unit cost multiplied by the units completed. The cost of EWIP is costs are transferred to the next process (department) by debiting the WIP account of the process (department) receivi b. The journal entry for transferring costs from Plate Cutting to Welding