Please show work thank you! This problem is tough and I would like to understand it. All the information is in the question. A process

image text in transcribedimage text in transcribed

Please show work thank you! This problem is tough and I would like to understand it. All the information is in the question.

A process is composed of five resources working on products A, B, and C for eight hours a day. The table below summarizes the situation. You would need to choose a minute of work as the common flow unit for all products and resources. In addition, you need to explain and show your calculations steps. Some cells are prefilled for your reference. Use 2 decimal places. Note: if a worker works in multiple resources, the worker distributes his/her work time on those resources. In that case, the worker counts for the resources can be decimal numbers. On the supply side, we know how many workers are in charge of each resource and the processing time in minutes per unit for each product at each resource. Zero processing time means the product of interest does not go through the corresponding resource at all. Besides, 4 assume that inputs are always sufficient. On the demand side, we know demands for products A, B, and C per day as follows: demand for A is 156 units per day; demand for B is 180 units per day, and demand for C is 210 units per day. We assume a fixed product mix of A:B:C. (a) [2] Draw a process flow diagram of the process, assuming that there are buffers between resources. Make sure to have process boundaries. (b)[1] Find two measures of capacity for each resource as in the table. (c) [1] Find total workload on each resource. (d)[1] Find implied utilizations of individual resources. Draw the implied utilization profile. (e) [1] Find the bottleneck and the demand-acceptance ratio (if IU[BN] >1 then DAR=1/IU[BN] ). (f) [1] Based on the demand-acceptance ratio, find the effective flow rates of A, B, and C. Explain. (g)[1] Find total effective workload and effective IU on each resource. (h)[1] Find utilizations of individual resources. Draw the utilization profile. (i)[1] Process analysis is for designing and improving business processes! By looking at the implied utilization and utilization profiles, propose one way to reallocate workers among the resources so as to increase the flow rates of products A, B, and C. For this part, you should try to implement the table in Excel and reallocate workers in your Excel template. A process is composed of five resources working on products A, B, and C for eight hours a day. The table below summarizes the situation. You would need to choose a minute of work as the common flow unit for all products and resources. In addition, you need to explain and show your calculations steps. Some cells are prefilled for your reference. Use 2 decimal places. Note: if a worker works in multiple resources, the worker distributes his/her work time on those resources. In that case, the worker counts for the resources can be decimal numbers. On the supply side, we know how many workers are in charge of each resource and the processing time in minutes per unit for each product at each resource. Zero processing time means the product of interest does not go through the corresponding resource at all. Besides, 4 assume that inputs are always sufficient. On the demand side, we know demands for products A, B, and C per day as follows: demand for A is 156 units per day; demand for B is 180 units per day, and demand for C is 210 units per day. We assume a fixed product mix of A:B:C. (a) [2] Draw a process flow diagram of the process, assuming that there are buffers between resources. Make sure to have process boundaries. (b)[1] Find two measures of capacity for each resource as in the table. (c) [1] Find total workload on each resource. (d)[1] Find implied utilizations of individual resources. Draw the implied utilization profile. (e) [1] Find the bottleneck and the demand-acceptance ratio (if IU[BN] >1 then DAR=1/IU[BN] ). (f) [1] Based on the demand-acceptance ratio, find the effective flow rates of A, B, and C. Explain. (g)[1] Find total effective workload and effective IU on each resource. (h)[1] Find utilizations of individual resources. Draw the utilization profile. (i)[1] Process analysis is for designing and improving business processes! By looking at the implied utilization and utilization profiles, propose one way to reallocate workers among the resources so as to increase the flow rates of products A, B, and C. For this part, you should try to implement the table in Excel and reallocate workers in your Excel template

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions

Question

Please make it fast 7 6 1 . .

Answered: 1 week ago