please so your work Compute Lead Time Jackson Fabricators Inc, machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are
please so your work
Compute Lead Time Jackson Fabricators Inc, machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: miling and finishing. Parts are produced in batch sizes of 70 parts. A part requires 2 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7 minutes Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 4 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time 8 8 min min 559 min 48 X min Non-value-added time Total lead time 573 X min 62 X min 9 Value-added ratio (as a percent) Feedback Orechy Work Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started