Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Please solve only for empty blanks (cost per backpack AND cost per purse) with calculations shown. Thank you!! i Data Table X Pumpkin Bags Budget

image text in transcribedimage text in transcribedimage text in transcribed

Please solve only for empty blanks (cost per backpack AND cost per purse) with calculations shown. Thank you!!

i Data Table X Pumpkin Bags Budget for Costs and Activities For the Year Ended February 29, 2020 Direct materials-purses $ 303,800 Direct materials-backpacks 461,700 Direct manufacturing labor-purses 93,000 Direct manufacturing labor-backpacks 97,200 Setup 114,400 Shipping 72,400 Design 168,000 Plant utilities and administration 249,000 Total $ 1,559,500 Other budget information follows: Backpacks Purses Total Number of bags 6,075 3,100 9,175 Hours of production 1,555 2,595 4,150 Number of batches 150 50 200 Number of designs 3 3 6 Print Done Pumpkin Bags (PB) is a designer of high-quality backpacks and purses. Each design is made in small batches. Each spring, PB comes out with new designs for the backpack and the purse. The company uses these designs for a year and then moves on to the next trend. The bags are all made on the same fabrication equipment that is expected to operate at capacity. The equipment must be switched over to a new design and set up to prepare for the production of each new batch of products. When completed, each batch of products is immediately shipped to a wholesaler. Shipping costs vary with the number of shipments. Budgeted information for the year is as follows: :: (Click the icon to view the budgeted information.) Read the requirements. Requirement 3. Calculate the budgeted cost per unit of cost driver for each cost category. (Round the cost driver rates to four decimal places. Abbreviations used: "util." = utilities, "admin" = administration, "DM" = direct materials, "DL" = direct labor.) Cost + Cost driver rate DM-purses $ 303,800 + Total quantity of cost driver = 3,100 = $ 6,075 = $ 98.00 per purse DM-backpacks $ 461,700 + 76.00 per backpack DL-purses $ 93,000 3,100 = $ $ 30.00 per purse DL-backpacks $ 97,200 6,075 = $ 16.00 per backpack Setup costs $ 114,400 + 200 = $ 572.00 per batch Shipping costs $ 72,400 + 200 = $ 362.00 per batch $ 168,000 + 6 = $ 28,000.00 per design Design costs Plant util. and admin. $ 249,000 + 4,150 = $ 60.00 per hour Requirement 4. Calculate the budgeted total costs and cost per unit for each product line. Backpacks Purses Direct materials $ 461,700 $ 303,800 Direct labor 97,200 93,000 Setup 85,800 28,600 Shipping 54,300 18,100 Design 84,000 84,000 Plant utilities and administration 93,300 155,700 $ Total costs 876,300 $ 683,200 The cost per backpack is and the cost per purse is

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students also viewed these Accounting questions