Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

please tell me the solution asap:-( John Fleming, chief administrator for a district hospital, is concerned about costs for tests in the hospital's lab. Fleming

please tell me the solution asap:-(
image text in transcribed
image text in transcribed
image text in transcribed
John Fleming, chief administrator for a district hospital, is concerned about costs for tests in the hospital's lab. Fleming has asked you to evaluate costs for the past month. The following information is available: a Basically, two types of tests are performed in the lab-blood tests and smears. During the past month 2700 blood tests and 3,600 smears were performed in the lab. b. Small glass plates are used in both types of tests. During the past month, the hospital purchased 18,000 plates at a cost of $44100 This cost is net of a 6% quantity discount. 1.800 of these plates were still on hand unused at the end of the month; there were no plates on hand at the beginning of the month. c. During the past month, 1,650 hours of labour time were recorded in the lab. The cost of this labour time was $20,130 d. Variable overhead cost last month in the lab for utilities and supplies totalled $11,385 The hospital has never used standard costs. By searching industry literature, however, you have determined the following nationwide averages for hospital labs: Plates Two plates are required per lab test. These plates cost $2.60 each and are disposed of after the test is completed Labour: Each blood test should require 0.30 hour to complete, and each smear should require 0.15 hour to complete. The were cost of this lab time is $14.00 per hour. Overhead: Overhead cost is based on direct labour-hours. The average rate for variable overhead is 55.90 per hour. Fleming would like a complete analysis of the cost of plates, labour, and overhead in the lab for the last month so that he can get to the root of the lab's cost problem. Required: 1. Compute a materials price variance for the plates purchased last month and a materials quantity variance for the plates used last month. (Indicate the effect of each variance by selecting "F" for favourable, "U" for unfavourable, and "None" for no effect (.e., zero variance).) 27001 Materials price variance Next Proy 4 of 4 IUI TUVUMILIE, VIETOVVICIIS, TUITE VI UTILA.. XTURE WILLE MIE NIET VOILE My Dresy. zero variance).) $ 2.700 Matenals price variance Materials quantity variance U 2. For labour cost in the lab: o. Compute a labour rate variance and a labour efficiency variance. (Do not round intermediate calculations. Round "Efficiency variance" answer to 2 decimal places, Indicate the effect of each variance by selecting "F" for favourable, "U" for unfavourable, and "None" for no effect (i.e., zero variance).) Labour rale variance Labour efficiency variance b. This part of the question is not part of your Connect assignment 3-o. Compute the variable overhead spending and efficiency variances. (Do not round intermediate colculations. Round "Efficiency variance" answer to 2 decimal places. Indicate the effect of each variance by selecting "F" for favourable. "U" for unfavourable, and "None" for no effect (e., zero variance.).) Vanable overhead sponding variance Variable overhead officiency variance 3-b. Is there any relationship between the variable overhead efficiency variance and the labour efficiency variance? Yes No

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing Diversity In Library Collections

Authors: Rosalind Washington, Sarah Voels

1st Edition

1440878749, 978-1440878749

More Books

Students also viewed these Accounting questions