pleaseanswer the empty boxes. the second pucture shows my originalanswers for clamp, handle and casting (165) which was incorrect. As the production planner for Xiangling
pleaseanswer the empty boxes. the second pucture shows my originalanswers for clamp, handle and casting (165) which was incorrect. As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 2 clamps a 2 answers