Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Practice question: An engineering consulting firm for a small business has designed the production capacity for Jay's Truck Wash to be 50 trucks per day.

image text in transcribed
image text in transcribed
image text in transcribed
Practice question: An engineering consulting firm for a small business has designed the production capacity for Jay's Truck Wash to be 50 trucks per day. But due to the truck wash requiring some manual human focused work to hand-dry trucks once they leave the wash cycle, the system capacity is actually 40 trucks per day. However, Jay has noticed a decline in his profits over the past 3 months because the anecdotal data shows on average the business is only seeing 36 cars per day. 1. What is the efficiency and utilization of Jay's truck wash business? 2. If Jay has 2 people drying cars, working 7.5hours each per day - what is their productivity? 3. If Jay wants to increase the productivity of his two staff to 3 trucks, how efficient will this make his business? Is this productivity achievable? Overview David Christopher is an orthopedic surgeon who currently works 11 hour days four days a week and finds it difficult to estimate his workload and whether he needs to hire additional surgeons. Capacity Required (C)-Setup Time (S) Processing Time (P.Order Sire ON Case Questions and Brief Answers a) What is their current weekly workload? Surgeon Identity Demand (No. of Patients Scheduled this Week) R B B 30 Orthopedic Surgeon Surgery Surgery Changeover Time Procedure Time (minutes) (minutes) Rotator cuff repair 20 45 Cartilage knee repair 20 30 Fracture tibiafibula 20 60 Achilles tendenrepair 20 30 ACL ligament repair 60 Fractured hip 90 Fractured wris 30 25 Fractured ankle 30 90 Hip replacement 150 Knee replacement 60 120 Shoulder replacement 180 Big toe replacement 45 90 Orthopedic Surgeons One-Week Surgery Workload b) should they hire more surgeons, and if so, how many? A A 1 1 3 4 0 2 1 2 3 1 0 60 B B 2. What other options and changes could you make to maximize patient throughput and surgeries, and therefore revenue, yet not compromise on the quality of medical care (0) Given the following data for Albert's fabricating production area: Fixed costs for one shit $60,000 Unit variable cost 57 Selling price $12 Number of machines 5 Number of working days in year 340 Processing time per unit 50 minutes 2. What is the annual capacity with a single 8-hour shift? b. What is the capacity with two shit? c. What is the break-even volume with a single-shift operation? David Christopher is an orthopedic surgeon who currently works 11 hour days four days a week and finds it difficult to estimate his workload and whether he needs to hire additional surgeons. Capacity Required (C)= Setup Time (S) + [Processing Time (P)*Order Size (Q1 Case Questions and Brief Answers a) What is their current weekly workload? Surgeon Identity Orthopedie Surgeon Surgery Surgery Changeover Time Procedure Time (minutes) (minutes) Rotator cuff repair 20 45 Cartilage knee repair 20 30 Fracture tibia/fibula 20 60 Achilles tendon repair 20 30 ACL ligament repair 20 60 Fractured hip 30 90 Fractured wrist 30 75 Fractured ankle 30 90 Hip replacement 60 150 Knee replacement 60 120 Shoulder replacement 60 180 Big toe replacement 45 90 Orthopedic Surgeons One-Week Surgery Workload b) Should they hire more surgeons, and if so, how many? B B B B B A A A A A B B Demand (No. of Patients Scheduled this Weck) 2 1 1 3 4 0 2 1 2 3 1 0 Practice question: An engineering consulting firm for a small business has designed the production capacity for Jay's Truck Wash to be 50 trucks per day. But due to the truck wash requiring some manual human focused work to hand-dry trucks once they leave the wash cycle, the system capacity is actually 40 trucks per day. However, Jay has noticed a decline in his profits over the past 3 months because the anecdotal data shows on average the business is only seeing 36 cars per day. 1. What is the efficiency and utilization of Jay's truck wash business? 2. If Jay has 2 people drying cars, working 7.5hours each per day - what is their productivity? 3. If Jay wants to increase the productivity of his two staff to 3 trucks, how efficient will this make his business? Is this productivity achievable? Overview David Christopher is an orthopedic surgeon who currently works 11 hour days four days a week and finds it difficult to estimate his workload and whether he needs to hire additional surgeons. Capacity Required (C)-Setup Time (S) Processing Time (P.Order Sire ON Case Questions and Brief Answers a) What is their current weekly workload? Surgeon Identity Demand (No. of Patients Scheduled this Week) R B B 30 Orthopedic Surgeon Surgery Surgery Changeover Time Procedure Time (minutes) (minutes) Rotator cuff repair 20 45 Cartilage knee repair 20 30 Fracture tibiafibula 20 60 Achilles tendenrepair 20 30 ACL ligament repair 60 Fractured hip 90 Fractured wris 30 25 Fractured ankle 30 90 Hip replacement 150 Knee replacement 60 120 Shoulder replacement 180 Big toe replacement 45 90 Orthopedic Surgeons One-Week Surgery Workload b) should they hire more surgeons, and if so, how many? A A 1 1 3 4 0 2 1 2 3 1 0 60 B B 2. What other options and changes could you make to maximize patient throughput and surgeries, and therefore revenue, yet not compromise on the quality of medical care (0) Given the following data for Albert's fabricating production area: Fixed costs for one shit $60,000 Unit variable cost 57 Selling price $12 Number of machines 5 Number of working days in year 340 Processing time per unit 50 minutes 2. What is the annual capacity with a single 8-hour shift? b. What is the capacity with two shit? c. What is the break-even volume with a single-shift operation? David Christopher is an orthopedic surgeon who currently works 11 hour days four days a week and finds it difficult to estimate his workload and whether he needs to hire additional surgeons. Capacity Required (C)= Setup Time (S) + [Processing Time (P)*Order Size (Q1 Case Questions and Brief Answers a) What is their current weekly workload? Surgeon Identity Orthopedie Surgeon Surgery Surgery Changeover Time Procedure Time (minutes) (minutes) Rotator cuff repair 20 45 Cartilage knee repair 20 30 Fracture tibia/fibula 20 60 Achilles tendon repair 20 30 ACL ligament repair 20 60 Fractured hip 30 90 Fractured wrist 30 75 Fractured ankle 30 90 Hip replacement 60 150 Knee replacement 60 120 Shoulder replacement 60 180 Big toe replacement 45 90 Orthopedic Surgeons One-Week Surgery Workload b) Should they hire more surgeons, and if so, how many? B B B B B A A A A A B B Demand (No. of Patients Scheduled this Weck) 2 1 1 3 4 0 2 1 2 3 1 0

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial & Managerial Accounting For Undergraduates

Authors: Jason Wallace, James Nelson, Karen Christensen, Theodore Hobson, Scott L. Matthews

2nd Edition

161853310X, 9781618533104

More Books

Students also viewed these Accounting questions

Question

What is memory?

Answered: 1 week ago