Question
Predetermined Overhead Rate, Overhead Variances, Journal Entries Craig Company uses a predetermined overhead rate to assign overhead to jobs. Because Craig's production is machine intensive,
Predetermined Overhead Rate, Overhead Variances, Journal Entries
Craig Company uses a predetermined overhead rate to assign overhead to jobs. Because Craig's production is machine intensive, overhead is applied on the basis of machine hours. The expected overhead for the year was $5,767,000, and the practical level of activity is 395,000 machine hours.
During the year, Craig used 403,000 machine hours and incurred actual overhead costs of $5,801,800. Craig also had the following balances of applied overhead in its accounts:
Work-in-process inventory | $ | 568,340 |
Finished goods inventory | 602,880 | |
Cost of goods sold | 1,968,780 |
Required:
1. Compute a predetermined overhead rate for Craig. Round your answer to the nearest cent.
$ per machine hour
2. Compute the overhead variance, and label it as under- or overapplied. $ overapplied
3. Assuming the overhead variance is immaterial, prepare the journal entry to dispose of the variance at the end of the year.
4. Assuming the overhead variance is material, prepare the journal entry that appropriately disposes of the overhead variance at the end of the year. If an amount box does not require an entry, leave it blank.
Overhead control | ___ ____ | ||
Work-in-process inventory | ____ _____ | ||
Finished goods inventory | _____ ______ | ||
Cost of goods sold | ____ _____ | ||
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started