Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

Prepare a memo for Pipe Pro setting out your calculations, results, and suggestions for the estimate of the stormwater drainage system. The memo should include

image text in transcribed
image text in transcribed
Prepare a memo for Pipe Pro setting out your calculations, results, and suggestions for the estimate of the stormwater drainage system. The memo should include the following information: 1. The total quantities of excavated material, bedding material, and backfill measured in loose cubic yards (LCY). Use the cross section provided by Dirt Diggers. Total Pipe Length: 2000 ft slopes 38. 34 36" bedding material Figure 1. Cross Section of Trench Material Properties: Excavation: Swell Factor: 35% Compaction: Bedding Material Shrinkage: 23% Backfill Shrinkage: 48% Volume Excavation Bedding Backfill BCY (Bank) CCY (Compacted) LCY (Loose) The unit price and total price for each item in Dirk's fax. The total price of the stormwater system. Add 10% to your estimate for profit; otherwise you will get in trouble with your uncles. Fax from Dirk Dirkson with items to be priced Item Description Quantity Unit Unit Price ($/) Total Price Trench Excavation LCY Pipe Material LF Bedding Material LCY Place Bedding Material hr Compact Bedding hr Material Lay & Joint Pipe hr Backfill Trench hr Compact Backfill hr Overhead hr

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Entrepreneurship

Authors: Andrew Zacharakis, William D Bygrave

5th Edition

1119563097, 9781119563099

Students also viewed these General Management questions