Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

PREPARING AN EIA REPORT/EIS FOR WASTE DISPOSAL SITE Kuwait is among the highest per capita waste generators in the world. Each year more than 2

image text in transcribed
PREPARING AN EIA REPORT/EIS FOR WASTE DISPOSAL SITE Kuwait is among the highest per capita waste generators in the world. Each year more than 2 million tons of solid waste in generated. The dominant solid waste disposal method in Kuwait is landfill, where there are 18 landfills, of which 14 sites are closed and 4 sites are still in operation. About 90 percent of the domestic waste is sent to landfills which imply that more landfills will be required to tackle rapidly increasing volumes of solid wastes. Consequently, there is a need to develop new waste site to accommodate a rapidly growing quantities of waste. Prepare ELA report taking into account the following guidelines. Your EIS (Environmental Impact Statement) should not exceed two (2) pages. The assignment is due on 28 Oct. 2018 Project Name: n Site selection (Place of Construction): detailed address of project location, and where a highway or a railway is involved, names of start station and end station should be provided. a Category: Schedule 1 or 2, according to national standards Brief Information on Natural Environment (Topography, Landforms, Geology, Climate, Meteorology, Hydrology, Vegetation. An Analysis on Environmental Impacts o Impact on air quality during construction period Impact on water quality during construction period Impact of noise during construction period The potential impact of fire on the environment include: o The discharge of the gaseous and particulate products of combustion into the atmosphere (from uncontrolled fires, especially large ones). o The potential contamination of surface/groundwater, and land o During the construction period, the proposed project may generate noise, waste gas, wastewater and construction refuse u pollution control measures to minimize impacts of noise, waste gas, wastewater and construction refuse during the construction period rConclusions

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Foundations Of Financial Management

Authors: Stanley Block

8th Canadian Edition

0070965447, 9780070965447

More Books

Students also viewed these Finance questions

Question

Did the researcher provide sufficient thick description?

Answered: 1 week ago