Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Problem 1 (27.5 points). The following production order needs to be stored on day 80. The lot size of the order is 50 units. The
Problem 1 (27.5 points). The following production order needs to be stored on day 80. The lot size of the order is 50 units. The data for the route sheet and work center files is available, Routing Sheet Setup Run Operation Work Time Time Operation No. Center (standard (standard Desc. hours) hours) 10 ABC 0.10 0.10 Kitting 20 DEF 0.30 0.55 Assembly 30 XYZ 0.15 0.33 Solder Work Center File: Work Queue Wait Move Center (days) | (days) (days) 1 1 ABC DEF XYZ 2 3 1 1 4 3 2 a. (13.75 points). Calculate the load for each operation in number of days rounded up to the nearest 8 hours b. (13.75 points). Complete the backward schedule in days using the data provided: Operation No Work Center Arrival Date Queue Operation Finish (days) (days) Date Wait and Move (days) 10 20 30 Store ABC DEF XYZ Store 1 80
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started