Answered step by step
Verified Expert Solution
Link Copied!
Question
1 Approved Answer

Problem 1 A hotel project is to be developed in an open space of 1.477 acres in San Jose. After development, the project site will

image text in transcribed
Problem 1 A hotel project is to be developed in an open space of 1.477 acres in San Jose. After development, the project site will consist of building structure, driveway, parking area, walkway, landscape area, and open area. They are denoted by "DMA" and are described in the following table. The post-construction stormwater will be controlled by an infiltration basin located in the open area and by pervious concrete pavement installed in the driveway and parking areas. Based on the Urban Runoff Quality Management approach, please (1) design the pervious concrete pavement and (2) determine the size of the infiltration basin. Please note: The required drawdown time for the infiltration basin is 48 hours. The in-situ infiltration rate is 2.1 in/hr for the project site. The mean annual precipitation at the project site is 14.4 inches. Required capture of stormwater runoff is 80%. Traffic index is 5 and California R-value is 6 for driveway and parking areas. Infiltration rate for the pervious concrete pavement is 2 in/hr. Time to fill the infiltration basin is 2 hours. Post-development Characteristics of DMAS Sub-area Description Area (sq-ft) Impervious (%) DMA-1 Building Structure 12,494 100 DMA-2 Driveway 18,354 0 DMA-3 o 14,556 Parking Area Walkway 3,047 DMA-4 100 DMA-5 0 11,433 Landscape Area DMA-6 0 4,454 Open Space Problem 1 A hotel project is to be developed in an open space of 1.477 acres in San Jose. After development, the project site will consist of building structure, driveway, parking area, walkway, landscape area, and open area. They are denoted by "DMA" and are described in the following table. The post-construction stormwater will be controlled by an infiltration basin located in the open area and by pervious concrete pavement installed in the driveway and parking areas. Based on the Urban Runoff Quality Management approach, please (1) design the pervious concrete pavement and (2) determine the size of the infiltration basin. Please note: The required drawdown time for the infiltration basin is 48 hours. The in-situ infiltration rate is 2.1 in/hr for the project site. The mean annual precipitation at the project site is 14.4 inches. Required capture of stormwater runoff is 80%. Traffic index is 5 and California R-value is 6 for driveway and parking areas. Infiltration rate for the pervious concrete pavement is 2 in/hr. Time to fill the infiltration basin is 2 hours. Post-development Characteristics of DMAS Sub-area Description Area (sq-ft) Impervious (%) DMA-1 Building Structure 12,494 100 DMA-2 Driveway 18,354 0 DMA-3 o 14,556 Parking Area Walkway 3,047 DMA-4 100 DMA-5 0 11,433 Landscape Area DMA-6 0 4,454 Open Space

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image
Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting Custom Edition For National American University

Authors: Charles T. Horngren, Walter T. Harrison Jr, M. Suzanne Oliver

9th Edition

1256297585, 978-1256297581

More Books

Students explore these related Accounting questions