Problem 1: Build a simulation model using Simul8 for a five-machine-four-buffer production line. You can directly use the Simul8 example file I uploaded to HuskyCT.

Problem 1: Build a simulation model using Simul8 for a five-machine-four-buffer production line. You can directly use the Simul8 example file I uploaded to HuskyCT. The machines all have processing time of exactly 1 min (fixed constant). The up- and downtimes of the machines all follow exponential distribution with MTBF = 40 min and MTTR = 10 min. Each buffer has capacity of 10. (a) Use Simul8 to estimate the (steady state) throughput of the production line. (b) Use Simul8 to estimate the (steady state) average work-in-process of each buffer. (c) Use Simul8 to estimate the (steady state) starvation and blockage of each machine. (d) Use Simul8 to estimate the (steady state) utilization of each machine (i.e., fraction of time the machine is working). (e) Comment on your observations of the system performance measures obtained above. (f) Now, if you have a chance to decrease one machine's cycle time to 0.5 min, which one should it be in order to maximize the resulting throughput? Use simulation to support your answer. For (a)-(d) and (f), please provide screenshots of Simul8 showing the source of the numbers obtained.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Basic Technical Mathematics

Authors: Allyn J. Washington, Richard Evans

12th Edition

9780137529896

Students also viewed these Law questions