Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Problem 1 The continuous timing method in direct time study was used to obtain the elements. Elements ( a ) ( 2 ?minutes ) ?and
Problem
The continuous timing method in direct time study was used to obtain the elements. Elements a ?minutes ?and Element b ?minutes ?are operator controlled and external to the machine cycle, and they were performance rated at ?Element c ?minutes ?is a machine controlled element and the time is constant. If the machine cycle allowance is ?and the worker PFD allowance is ?determine a ?the normal time, b ?the standard time for the cycle.
Problem
Nine cycles have been observed during a direct time study. The mean for the largest element time is ?minutes, and the corresponding sample standard deviation is ?minute, which was also the largest. If the analyst wants to be ?confident that the mean of the sample was within ?of the true mean many more observations should be taken.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started