Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Problem 1. The production manager at Sunny Soda, Inc., is interested in tracking the quality of the company's 12-ounce bottle filling line. The bottles
Problem 1. The production manager at Sunny Soda, Inc., is interested in tracking the quality of the company's 12-ounce bottle filling line. The bottles must be filled within the tolerances set for this product because the dietary information on the label shows 12 ounces as the serving size. The design specification for the product calls for a fill level of 12.000.10 ounces. The manager collected the following sample data (in fluid ounces per bottle) on the production process. Observation Sample 1 2 3 4 10 1234567 ag 12.00 11.97 12.10 12.08 11.91 11.94 12.10 11.96 11.89 12.02 11.97 11.99 12.10 12.09 12.05 11.95 12.08 11.92 12.12 12.05 11.94 11.98 12.06 12.08 12.09 12.00 12.00 12.03 8 12.01 12.04 11.99 11.95 9 12.00 11.96 11.97 12.03 11.92 11.94 12.09 12.00 11 11.91 11.99 12.05 12.10 12 12.01 12.00 12.06 11.97 13 11.98 11.99 12.06 12.03 14 12.02 12.00 12.05 11.95 15 12.00 12.05 12.01 11.97 a) (10 points) Calculate control limits for R-chart and draw the R-chart. b) (10 points) Calculate control limits for X-chart and draw the x-chart. c) (10 points) From the charts, is the process in control? And why? d) (20 points) Assuming the population mean and standard deviation of the bottle filling line are 12.01 ounces and 0.023 ounces, respectively. Is the process capable of producing products that comply with the design specifications? Explain.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started