Question
Problem 11-10 Please show work. The Lawn Company produces rubber seals used in the aerospace industry. Standards call for 3 pounds of material at $2.49
Problem 11-10
Please show work.
The Lawn Company produces rubber seals used in the aerospace industry. Standards call for 3 pounds of material at $2.49 per pound for each seal. The standard cost for labor is 1.5 hours at $15.00 per hour. Standard overhead is $10.00 per unit. For the year 2018, expected production is 128,900 seals with fixed overhead of $128,900 and variable overhead of $9.00 per seal. During 2018, a total of 125,000 seals were produced. The company purchased 455,000 pounds of material for $1,151,150. Production required 402,100 pounds of material. The cost of direct labor incurred was $2,900,000 with an actual average wage rate of $15.25 per hour. Actual overhead for the year was $928,000.
Problem 11-10 The Lawn Company produces rubber seals used in the aerospace industry. Standards call for 3 pounds of material at $2.49 per pound for each seal. The standard cost for labor is 1.5 hours at $15.00 per hour. Standard overhead is $10.00 per unit. For the year 2018, expected production is 128,900 seals with fixed overhead of $128,900 and variable overhead of $9.00 per seal. During 2018, a total of 125,000 seals were produced. The company purchased 455,000 pounds of material for $1,151,150. Production required 402,100 pounds of material. The cost of direct labor incurred was $2,900,000 with an actual average wage rate of $15.25 per hour. Actual overhead for the year was $928,000. Determine the standard cost per seal. (Round answer to 2 decimal places, e.g. 15.25.) $ Standard cost per seal Calculate the material, labor, and overhead variances. (Round intermediate calculations to 2 decimal places, e.g. 14.37 and final answers to 0 decimal places, e.g. 125. Enter all variances as a positive number.) $ Material Price Variance $ Material Quantity Variance $ Labor Rate Variance $ Labor Efficiency Variance $ Controllable Overhead Variance $ Overhead Volume Variance Prepare a variance summary. (Enter unfavorable variances using either a negative sign preceding the number e.g. -45 or parentheses e.g. (45).) $ Material Price Variance Material Quantity Variance Labor Rate Variance Labor Efficiency Variance Controllable Overhead Variance Overhead Volume Variance $ Total Indicate which variances should be investigated. Need to be investigated Material Price Variance Material Quantity Variance Labor Rate Variance Labor Efficiency Variance Controllable Overhead Variance Overhead Volume VarianceStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started