Question: Problem 17.3: the ideal cycle time of an assembly machine is 5 sec. the parts feeder at one of the workstations has a feed rate

Problem 17.3: the ideal cycle time of an assembly machine is 5 sec. the parts feeder at one of the workstations has a feed rate of 75 components/min and the probability that the components will pass through the selector is 18%. The active length of the feed track (where the high-level sensor is located) is 350 mm. the low-level sensor on the feed track is located 100 mm from the station work head. The components have a length of 12.5 mm in the feed track direction, and there is no overlapping of parts.

(a) How long will it take for the supply of parts to be depleted from the high-level sensor to the low-level sensor once the feeder-selector device is turned off?

(b) How long will it take for the parts to be resupplied from the low-level sensor to the high-level sensor, on average, after the feeder-selector device is turned on and turned off?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!