Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

Problem 2 (27.5 points). The Music company produces bass guitars in Caguas, PR. The production levels are set up to match predicted demand as closely

image text in transcribed

Problem 2 (27.5 points). The Music company produces bass guitars in Caguas, PR. The production levels are set up to match predicted demand as closely possible. One of the instruments produced is the part number 500 bass guitar The figure below shows the part number 500 bass guitar and its subassemblies and components. The information of the product structure is represented in the indented bill of materials table. The first step in the assembly process is that the bridges are installed into the body, and the pegs are installed into the neck. Then, the body and the neck are assembled together. Finally, the strings are installed to get the final assembly. To procure the bridges from suppliers takes 1 week of lead time and 2 weeks lead time is required to complete the body. There are 5 bodies on hand. The delivery lead time of the strings is 2 weeks. The production manager wants to protect its strings inventory because of low performance supplier and decided to maintain a safety stock of 20 units each week. The neck requires 2 weeks to produce and the pegs have a lead time of 5 weeks. MANUFACTURING BILL OF MATERIAL Bridges Pegs Part Strings DD MAAN PARTNUMBER 500 - BASS GUITAR Description Quantity VOM Number Required 200 Body 1 each 205 Bridge Z each 300 String 4 each 400 Neck 1 each 405 Pegl 4 each Neck Body It takes 7 weeks to produce a bass guitar. Hence, the company must begin production now on bass guitars to be shipped in 7 weeks. For that reason, we will consider only forecasts for demands that are at least 7 weeks into the future. Suppose that predicted demands (gross requirements) for those weeks are: 8 Week Demand 9 30 10 25 11 10 12 15 90 These forecasts represent the number of bass guitars that the company would like to have ready to ship in the specified week. Based on the current anticipated retums, the company expects the following scheduled receipts to the inventory: 10 Week Scheduled Receipts 8 13 9 10 10 In addition, the company expects to have 23 bass guitars in inventory at the end of the week 7. The MPS for the bass guitars is now obtained by netting out the inventory on hand at the end of week 7 and scheduled receipts, in order to obtain net predicted demand

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions