Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 2 (Supplemental Problem #2) Activity-based costing versus traditional costing Lovelace Company produces only two products: reading glasses and sunglasses. The company uses a normal

Problem 2 (Supplemental Problem #2) Activity-based costing versus traditional costing Lovelace Company produces only two products: reading glasses and sunglasses. The company uses a normal cost system and overhead costs are currently allocated using a plant-wide overhead rate based on direct labor hours. Outside cost consultants have recommended that the company use activity-based costing to charge overhead to products. The company expects to produce 4,000 reading glasses and 8,000 sunglasses this year. Each pair of reading glasses requires two direct labor hours to produce and each pair of sunglasses requires one-half hour to produce. The direct material and direct labor costs per unit are as follows: Estimated total factory overhead data for the year is as follows: Required (Traditional Method):

1. Using the traditional cost assignment method, calculate the plant-wide overhead rate: Plant-wide overhead rate: $___________________per direct labor hour

2. Under the traditional cost assignment method using the plant-wide overhead rate, how much is the overhead cost per unit for the: Reading glasses: $________________per unit Sunglasses: $________________per unit

3. Using the traditional cost assignment method how much is the product cost per unit for the: Reading glasses: $________________per unit Sunglasses: $________________per unit *** Problem 2 is continued on the next page *** Reading Glasses Direct Material (per unit) $ 30.00 Direct Labor (per unit) $ 16.00 Sunglasses $ 17.00 $ 4.00 Activity Production setups Material handling Packaging and shipping Total factory overhead Budgeted Overhead Reading Glasses 5 setups 1,000 lbs. 4,000 boxes Sunglasses 15 setups 4,000 lbs. 2,000 boxes Total 20 setups 5,000 lbs. 6,000 boxes $ $ $ $ 80,000 70,000 120,000 270,000 4 Required (ABC Method):

4. Using the Activity-based Costing (ABC) assignment method, calculate the activity cost rates for the following activities: (a) Setup costs: $___________________per production run (b) Materials handling costs: $___________________per materials move (c) Packaging and shipping costs: $___________________per shipment

5. Using the Activity-based Costing (ABC) assignment method how much is the overhead cost per unit for the: Reading glasses: $________________per unit Sunglasses: $________________per unit 6. Using the Activity-based Costing (ABC) assignment method how much is the product cost per unit for the: Reading glasses: $________________per unit Sunglasses: $________________per unit 5

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Implementing And Auditing The Internal Control System

Authors: D. Chorafas

1st Edition

0333929365, 9780333929360

More Books

Students also viewed these Accounting questions