Problem 29: AutoIgnite produces electronic ignition systems for automobiles at a plant in Cleveland, Ohio. Each ignition system is assembled from two components produced at
Problem 29:
AutoIgnite produces electronic ignition systems for automobiles at a plant in
Cleveland, Ohio. Each ignition system is assembled from two components
produced at AutoIgnite's plants in Buffalo, New York, and Dayton, Ohio. The
Buffalo plant can produce 2000 units of component 1, 1000 units of component
2, or any combination of the two components each day. For instance, 60% of
Buffalo's production time could be used to produce component 1 and 40% of
Buffalo's production time could be used to produce component 2; in this case, the
Buffalo plant would be able to produce 0.60(2000) = 1200 units of component 1
each day and 0.40(1000) = 400 units of component 2 each day. The Dayton plant
can produce 600 units of component 1, 1400 units of component 2, or any
combination of the two components each day. At the end of each day, the
component production at Buffalo and Dayton is sent to Cleveland for assembly of
the ignition systems on the following workday.
1. Formulate a linear programming model that can be used to develop a daily
production schedule for the Buffalo and Dayton plants that will maximize daily
production of ignition systems at Cleveland.
2. Find the optimal solution.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started