Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 3-16A Contrasting ABC and Conventional Product Costs [LO3-2, LO3-3, LO3-4] [The following information applies to the questions displayed below.] For many years, Thomson Company

Problem 3-16A Contrasting ABC and Conventional Product Costs [LO3-2, LO3-3, LO3-4]

[The following information applies to the questions displayed below.]

For many years, Thomson Company manufactured a single product called LEC 40. Then three years ago, the company automated a portion of its plant and at the same time introduced a second product called LEC 90 that has become increasingly popular. The LEC 90 is a more complex product, requiring 0.80 hours of direct labor time per unit to manufacture and extensive machining in the automated portion of the plant. The LEC 40 requires only 0.40 hours of direct labor time per unit and only a small amount of machining. Manufacturing overhead costs are currently assigned to products on the basis of direct labor-hours.

Despite the growing popularity of the companys new LEC 90, profits have been declining steadily. Management is beginning to believe that there may be a problem with the companys costing system. Direct material and direct labor costs per unit are as follows:

LEC 40 LEC 90
Direct materials $ 30.00 $ 50.00
Direct labor (0.40 hours and 0.80 hours @ $15.00 per hour) $ 6.00 $ 12.00

Management estimates that the company will incur $912,000 in manufacturing overhead costs during the current year and 60,000 units of the LEC 40 and 20,000 units of the LEC 90 will be produced and sold.

Problem 3-16A Part 1

Required:
1-a.

Compute the predetermined overhead rate assuming that the company continues to apply manufacturing overhead cost on the basis of direct labor-hours. (Round your answer to 2 decimal places.)

1-b. Using this rate and other data from the problem, determine the unit product cost of each product. (Do not round intermediate calculations. Round your final answers to 2 decimal places.)

Problem 3-16A Part 2

2.

Management is considering using activity-based costing to assign manufacturing overhead cost to products. The activity-based costing system would have the following four activity cost pools:

Activity Cost Pool Activity Measure Estimated Overhead Cost
Maintaining parts inventory Number of part types $ 225,000
Processing purchase orders Number of purchase orders 182,000
Quality control Number of tests run 45,000
Machine-related Machine-hours 460,000

$ 912,000

Expected Activity
Activity Measure

LEC 40

LEC 90

Total

Number of part types 600 900 1,500
Number of purchase orders 2,000 800 2,800
Number of tests run 500 1,750 2,250
Machine-hours 1,600 8,400 10,000

Determine the activity rate for each of the four activity cost pools. (Round your answers to 2 decimal places.)

Problem 3-16A Part 3

3. Using the activity rates you computed in part (2) above, do the following:

a.

Determine the per unit amount of manufacturing overhead cost that would be assigned to each product using the activity-based costing system. (Do not round intermediate calculations. Round your answers to 2 decimal places.)

b. Compute the unit product cost of each product. (Do not round intermediate calculations. Round your final answers to 2 decimal places)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Understanding And Conducting Information Systems Auditing

Authors: Arif Ahmed, Veena Hingarh

1st Edition

1118343743, 978-1118343746

More Books

Students also viewed these Accounting questions