Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Problem 9-51 Activity-Based Costing and Predetermined Overhead Allocation Rates (LO 9-3, 5, 6) Kitchen Supply, Inc. (KSI), manufactures three types of flatware: institutional, standard, and
Problem 9-51 Activity-Based Costing and Predetermined Overhead Allocation Rates (LO 9-3, 5, 6) Kitchen Supply, Inc. (KSI), manufactures three types of flatware: institutional, standard, and silver. It applies all indirect costs according to a predetermined rate based on direct labor-hours. A consultant recently suggested that the company switch to an activity-based costing system and prepared the following cost estimates for year 2 for the recommended cost drivers. Activity Processing orders Setting up production Handling materials Machine depreciation and maintenance Performing quality control Packing Total estimated cost Recommended Cost Driver Number of orders Number of production runs Pounds of materials used Machine-hours Number of inspections Number of units Estimated Cost $ 42,000 187,000 280,000 220,000 68,000 122,500 $919,500 Estimated Cost Driver Activity 175 orders 110 runs 100,000 pounds 11,000 hours 50 inspections 490,000 units In addition, management estimated 7,500 direct labor-hours for year 2. Assume that the following cost driver volumes occurred in January, year 2: Institutional 60,000 $42,000 440 Standard 25,000 $21,000 430 Silver 10,000 $18,000 580 12 Number of units produced Direct materials costs Direct labor-hours Number of orders Number of production runs Pounds of material Machine-hours Number of inspections Units shipped 15,000 580 6,000 130 3,400 100 60,000 25,000 10,000 Actual labor costs were $14 per hour. Required: (1) Compute a predetermined overhead rate for year 2 for each cost driver using the estimated costs and estimated cost driver units prepared by the consultant. (Round your answers to 2 decimal places.) Activity Processing orders Setting up production Handling materials Using machines Performing quality control Packing Rate per order per run per pound per machine hour per inspection per unit (2) Compute a predetermined rate for year 2 using direct labor-hours as the allocation base. (Round your answer to Predetermined rate per direct labor-hour b. Compute the production costs for each product for January using direct labor-hours as the allocation base and the predetermined rate computed in requirement a(2). (Do not round intermediate calculations.) Institutional $ 42,000 Standard $ 21,000 $ Silver 18,000 Total 81,000 $ Account Direct materials Direct labor Indirect costs Total cost c. Compute the production costs for each product for January using the cost drivers recommended by the consultant and the predetermined rates computed in requirement a. (Note: Do not assume that total overhead applied to products in January will be the same for activity-based costing as it was for the labor-hour-based allocation.) (Do not round intermediate calculations.) Institutional $ 42,000 Standard $ 21,000 Silver 18,000 Total 81,000 $ $ Account Direct materials Direct labor Indirect costs Processing orders Setting up production Handling materials Using machines Performing quality control Packing Total cost
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started