Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 9-62 and 9-63 (Algo) Cain Components manufactures and distributes various plumbing products used in homes and other buildings. Over time, the production staff has

Problem 9-62 and 9-63 (Algo)

Cain Components manufactures and distributes various plumbing products used in homes and other buildings. Over time, the production staff has noticed that products they considered easy to make were difficult to sell at margins considered reasonable, while products that seemed to take a lot of staff time were selling well despite recent price increases. A summer intern has suggested that the cost system might be providing misleading information.

The controller decided that a good summer project for the intern would be to develop, in one self-contained area of the plant, an alternative cost system with which to compare the current system. The intern identified the following cost pools and, after discussion with some plant personnel, appropriate cost drivers for each pool. There were:

Cost Pools Costs Activity Drivers
Receiving $ 600,000 Direct material cost
Manufacturing 5,500,000 Machine-hours
Machine setup 900,000 Production runs
Shipping 1,000,000 Units shipped

In this particular area, Cain produces two of its many products: Standard and Deluxe. The following are data for production for the latest full year of operations.

Products
Standard Deluxe
Total direct material costs $ 210,000 $ 190,000
Total direct labor costs $ 650,000 $ 320,000
Total machine-hours 136,000 114,000
Total number of setups 110 90
Total pounds of material 14,500 12,500
Total direct labor-hours 6,350 4,100
Number of units produced and shipped 13,000 12,000

Problem 9-63 (Algo) Activity-Based Costing and Predetermined Overhead Rates (LO 9-3, 5, 6)

The intern decides to look more closely at the manufacturing activity and determines that it can be broken down into two activities: production and engineering. Production covers the costs of ongoing manufacturing while engineering includes those activities dealing with engineering changes, design modifications, and so on.

The costs attributed to production are $6,804,000 and the costs attributed to engineering are $2,736,000. After discussion with plant engineers, the intern decides that the best cost driver for engineering is setups, because most of the work arises from changes in the way the product is run.

image text in transcribedimage text in transcribed

Reg A1 Reg A2 Compute the totals of the cost driver rates shown below. (Round intermediate calculations and "Manufacturing" answer to 2 decimal places.) Receiving Production Engineering Machine setup Shipping % of material dollars per machine-hour per setup per setup per unit Req A1 Reg A2 What unit product costs will be reported for the two products if the revised ABC system is used? (Round "Unit cost" answers to 2 decimal places.) Standard Deluxe Direct Costs Overhead: Receiving Production Engineering Machine setup Shipping Total costs Number of units Unit cost 0 $ 0 0 0

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions