Question
Product A is an end item and is made from three units of B, four units of C and two units of D. B is
Product A is an end item and is made from three units of B, four units of C and two units of D. B is made of three units of E and two of F. C is made of two units of F and one of D. A and B have a lead time of one week. C and D have lead times of two weeks, and E and F have lead times of three weeks. Lot sizes for A, B and D are L4L. Item C has a lot size of 60. E and F have a lot size of 100. There is 40 units of item B on hand, and 20 units of item A. There is a scheduled receipt for 50 units of item F in week three. If 120 units of A are required in Week 8, develop the MRP planning schedule, specifying when items are to be ordered and received.
If 120 units of A are required in Week 8, develop the MRP planning schedule, specifying when items are to be ordered and received.
1. Product A (Lot-for-Lot):
- This is the final product or end item.
- It is made up of three subcomponents: B, C, and D.
- The lot-for-lot notation indicates that the lot size for Product A is determined based on its net requirements for each period.
2. Component B (Lot-for-Lot):
- A subcomponent of Product A.
- It is made up of two subcomponents: E and F.
- The lot-for-lot notation again means that the lot size for B is equal to its net requirements.
3. Component C (Lot size: 60):
- Another subcomponent of Product A.
- It is made up of two subcomponents: F and D.
- Unlike B, the lot size for C is specified as 60, meaning that in each production run, 60 units of C are produced.
4. Component D (Lot-for-Lot):
- A subcomponent of Product A.
- There is no specified lot size, so it follows a lot-for-lot production strategy.
5. Component E (Lot size: 100):
- A subcomponent of B.
- The lot size for E is specified as 100 units.
6. Component F (Lot size: 100):
- A subcomponent of both B and C.
- The lot size for F is specified as 100 units.
The representation essentially shows the structure of how Product A is built from its subcomponents, and it includes the lot sizes for each item. For items with a lot-for-lot strategy, the production quantity is determined by the net requirements for that period. For items with specified lot sizes, the same quantity is produced in each production run.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started