Question
Project Description: The students must form groups of 4 members each. Every team should design water, solar heating, electrical/fuel heating, and air-conditioning systems for a
Project Description: The students must form groups of 4 members each. Every team should design water, solar heating, electrical/fuel heating, and air-conditioning systems for a 170m^(2) flat. A proper software should be used to calculate water flow rates, pressures, temperatures, heating load, cooling load, hot water and cold water needs, in summer and winter, for a family of six members. The use of green energy should be maximized. They must include governing equations for each process and should include diagrams with all components identified, such as pipes, tanks, pumps, boilers, collectors, control devices, etc. At the end of the assignment, each group must submit a printed hard copy of the report. In addition, a soft copy of the report in
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started