Project Schedule for 4-Story Office Building UniFormat (Floor by Floor) Substructure Foundations: Weeks 1-4 Basement Construction: Weeks 1-5 First Floor Floor Construction: Weeks 5-8 Exterior
Project Schedule for 4-Story Office Building UniFormat (Floor by Floor) Substructure Foundations: Weeks 1-4 Basement Construction: Weeks 1-5 First Floor Floor Construction: Weeks 5-8 Exterior Walls: Weeks 9-12 Interior Construction: Weeks 13-18 Interior Finishes: Weeks 19-21 HVAC, Plumbing, Electrical: Weeks 22-27 Second Floor Floor Construction: Weeks 5-8 Exterior Walls: Weeks 9-12 Interior Construction: Weeks 13-18 Interior Finishes: Weeks 19-21 HVAC, Plumbing, Electrical: Weeks 22-27 Third Floor Floor Construction: Weeks 5-8 Exterior Walls: Weeks 9-12 Interior Construction: Weeks 13-18 Interior Finishes: Weeks 19-21 HVAC, Plumbing, Electrical: Weeks 22-27 Fourth Floor Floor Construction: Weeks 5-8 Exterior Walls: Weeks 9-12
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started