Question
PROJECT STEPS 1.Dewayne Lipinski works for Cairo Consulting in Albuquerque, New Mexico. As an intern, he is developing a workbook that includes the financial details
PROJECT STEPS
1.Dewayne Lipinski works for Cairo Consulting in Albuquerque, New Mexico. As an intern, he is developing a workbook that includes the financial details of the consulting services that the company offers. Dewayne has been asked to analyze the data to find the most profitable mix of offerings using the most cost-effective service providers. Switch to theManagementworksheet. make a one-variable data table to calculate the sales, expenses, and profit based on the hours of management consulting contracted, as follows:
a.In cell D5, enter a formula without using a function that references cellB4, which is the expected hours of management consulting contracted.
b.In cell E5, enter a formula without using a function that references cellB19, which is the expected total sales for management consulting.
c.In cell F5, enter a formula without using a function that references cellB20, which is the expected total expenses for this product.
d.In cell G5, enter a formula without using a function that references cellB21, which is the expected gross profit for this product.
e.Select the range D5:G10 and then complete the one-variable data table, using cellB4as the Column input cell for your data table.
2.make a two-variable data table to calculate the gross profit based on the hours of management consulting contracted and the hourly rate charged:
a.For the range D14:K19, make a two-variable data table using the hourly rate charged (cellB5) as the Row input cell.
b.Use the hours of management consulting contracted (cellB4) as the Column input cell.
c.Apply a custom format to cell D14 to display the textHours/Pricein place of the cell value.
3.Switch to theChangeworksheet. make a Scatter with Straight Lines chart based on the range D4:F14 in the data table Organizational Change - Break-Even Analysis.
4.Modify the new chart as follows:
a.Resize and reposition the chart so that it covers the range D15:H32.
b.Remove the chart title from the chart.
c.AddSales and Expensesas the vertical axis title andHours Contractedas the horizontal axis title.
5.Change the Bounds Axis Options as follows:
a.Change the Minimum Bounds of the vertical axis to 1,000,000 and leave the Maximum Bounds at 2,000,000.
b.Change the Number format of the vertical axis to Currency with 0 Decimal places and $ as the Symbol.
c.Change the Minimum Bounds of the horizontal axis to 3,000 and the Maximum Bounds to 5,000.
6.Create two scenarios to compare the costs for standard consultants and consultants with change certification as follows:
a.In the Scenario Manager, add two scenarios using the data shown in bold in Table 1 below.
b.The changing cells for both scenarios are the nonadjacent cells B11 and B14.
c.Close the Scenario Manager without showing any of the scenarios.
Table 1: Organizational Change Scenario Values
Values
Scenario 1
Scenario 2
Scenario Name
Standard
Certified
Variable_Cost_Per_Hour_Change (B11)
380
420
Total_Fixed_Cost_Change (B14)
380,000
335,000
7.Switch to theProcessworksheet.make a Scatter with Straight Lines chart based on range D6:I14 in the data table Process Consulting - Net Income Analysis.
8.Modify the new chart as follows:
a.Resize and reposition the chart so that it covers the range D15:I32.
b.Remove the chart title from the chart.
c.Reposition the chart legend to the right of the chart.
d.AddNet Incomeas the vertical axis title andHours Contractedas the horizontal axis title.
e.Change the colors of the chart toMonochromatic Palette 1(1st row in the Monochromatic palette).
9.Change the Bounds Axis Options for the new chart as follows:
a.Change the Minimum Bounds of the vertical axis to -100,000 and the Maximum Bounds to 650,000.
b.Set the horizontal axis to cross at the axis value -100,000.
c.Change the Number format of the vertical axis to Currency with 0 Decimal places and $ as the Symbol.
d.Change the Minimum Bounds of the horizontal axis to 3,500 and the Maximum Bounds to 7,500.
10.Edit the chart series names as follows:
a.For Series 1, use cell E5 as the series name.
b.For Series 2, use cell F5 as the series name.
c.For Series 3, use cell G5 as the series name.
d.For Series 4, use cell H5 as the series name.
e.For Series 5, use cell I5 as the series name.
11.Cairo Consulting wants to determine whether reselling process consulting services provided by third parties would reduce the costs of this type of consulting. Switch to theProcess Providersworksheet, and then run Solver to solve this problem as follows:
a.Set the objective as minimizing the value in cell E10 (Total Costs).
b.Use the range B4:D4 as the changing variable cells.
Adjust the hours provided by each company using the following constraints:
c.E4=5500, the total hours of process consulting signed
d.E10 is less than or equal to 1350000, the maximum third-party fees
e.B4:D4 is less than or equal to 5000, the maximum hours provided by a single third-party provider
f.B4:D4 should be an Integer
g.Run Solver, keep the solution, and then return to the Solver Parameters dialog box. Save the model to the range A14:A21, and then close the Solver Parameters dialog box.
12.Switch to theAll Typesworksheet. Use the Scenario Manager to make a Scenario Summary report that summarizes the effect of the Status Quo, Third Party, and Raise Rates scenarios. Use the range B17:D17 as the result cells.
13.Switch back to theAll Typesworksheet. Use the Scenario Manager as follows to compare the profit per hour in each scenario:
a.make a Scenario PivotTable report for result cells B17:D17.
b.Remove the Filter field from the PivotTable.
c.Change the Number format of the Profit_Per_Hour_Contracted_Mana, Profit_Per_Hour_Contracted_Chan, and Profit_Per_Hour_Contracted_Proc fields (located in the Values box of the PivotTable Field List) to Currency with 2 Decimal places and $ as the Symbol.
d.UseManagementas the row label value in cell B3,Changeas the value in cell C3, andProcessas the value in cell D3.
e.In cell A1, useProfit Per Hour Contractedas the report title.
f.Format the report title using theTitlecell style.
g.Resize columns A-D to 15.00.
14.Add a PivotChart to theScenario PivotTableworksheet as follows:
a.make a Clustered Column PivotChart based on the PivotTable.
b.Resize and reposition the chart so that it covers the range A8:D20.
c.Hide the field buttons in the chart.[Mac Hint: The Field Buttons option is not available on Excel 2019 for the Mac, so Mac users can ignore this instruction.]
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started