Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Provide neat & clean full solution for good rating ! Three product models, A, B and C, are to be produced on a mixed model
Provide neat & clean full solution for good rating !
Three product models, A, B and C, are to be produced on a mixed model assembly line. Hourly production rate and work content time for model A are 5 units/hr and 32.0 min, respectively, for model B are 10 units/hr and 24.0 min, respectively, and for model C are 10 units/hr and 28.0 min, respectively. The line repositioning time is 0.15 min. 1. Determine how many workers and workstations must be on the production line in order to complete this workload. (Assume line efficiency = 0.95, balance efficiency = 0.93, and manning level = 1). 2. Calculate the fixed rate launching interval and 3. Determine the launch sequence of models A, B and C during one hour of production. Assembly line design and operational features Your short answer Number of work station Fixed rate launching interval (minutes) Fixed rate launching sequence of models A, B and C. during one hour of production (show only the list (e.g. ABC..... up to final launch). Detail calculation has to be shown only in the booklet. Three product models, A, B and C, are to be produced on a mixed model assembly line. Hourly production rate and work content time for model A are 5 units/hr and 32.0 min, respectively, for model B are 10 units/hr and 24.0 min, respectively, and for model C are 10 units/hr and 28.0 min, respectively. The line repositioning time is 0.15 min. 1. Determine how many workers and workstations must be on the production line in order to complete this workload. (Assume line efficiency = 0.95, balance efficiency = 0.93, and manning level = 1). 2. Calculate the fixed rate launching interval and 3. Determine the launch sequence of models A, B and C during one hour of production. Assembly line design and operational features Your short answer Number of work station Fixed rate launching interval (minutes) Fixed rate launching sequence of models A, B and C. during one hour of production (show only the list (e.g. ABC..... up to final launch). Detail calculation has to be shown only in the bookletStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started