Q 4 - Jobs arrive to a two - station serial line at a rate of 2 jobs per hour with deterministic interarrival times. Station
Q Jobs arrive to a twostation serial line at a rate of jobs per hour with deterministic interarrival times. Station has two machines, where each requires minutes to process a job with Station has one machine which requires minutes to process a job with provided it is up but is subject to exponential failures where the mean time to failure is hours and the mean time to repair is hour. What are the and WIP for the line?