Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Q1 Copy Cantik (CC) is a fledging copy center in downtown Parit Raja run by two college students. Currently, the equipment consists of two
Q1 Copy Cantik (CC) is a fledging copy center in downtown Parit Raja run by two college students. Currently, the equipment consists of two high-speed copiers that can be operated by one operator. If the students work alone, it is conceivable that two shifts per day can be staffed. The students each work 8-hours a day, 5 days a week. They do not take breaks during the day, but they do allow themselves 30 minutes for lunch or dinner. In addition they service the machines for about 30 minutes at the beginning of each shift. The time required to set up for each order varies by the type of paper, use of color, number of copies, and so on. Estimates of setup time are kept with each order. Since the machines are new, their efficiency is estimated at 90 percent. Due to extensive advertising and new customer incentives, orders have been pouring in. The students need help determining the capacity or their operation and the current load on their facility. The information of operation is shown in Table Q1: Table Q1: Operation Information Job No No. of Copies Setup Time (min) Run Time (min/unit) 10 500 5.2 0.08 20 1000 10.6 0.10 30 5000 3.4 0.12 40 4500 11.2 0.14 50 2000 15.3 0.10 (a) Calculate: (i) The normal daily capacity of Copy Cantik. (3 marks) (ii) Total load for next Monday. (7 marks) (iii) Load percent. (2 marks) (b) Intepret the result based on Q1(a)(iii). (4 marks) (c) Compare the result in Q1(a)(iii) if each worker extend working time by approximately 36 minutes. (5 marks)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started