Question

1 Approved Answer

Q2. 0 A 6.6KV Main Switch Board of a factory receive 6.6KV supply from Power Grid. The Contract Capacity is at 1500 kW. The table

image text in transcribed
image text in transcribed
image text in transcribed
Q2. 0 A 6.6KV Main Switch Board of a factory receive 6.6KV supply from Power Grid. The Contract Capacity is at 1500 kW. The table below shows the kWh meter readings of a typical day of the factory in a 24 hours period. Time Meter Reading Time Meter Reading (kWh) (kWh) 0:00 0 12:00 3800 0:30 0 12:30 4200 1:00 0 13:00 4600 1:30 0 13:30 5000 2:00 0 14:00 5400 2:30 0 14:30 6000 3:00 0 15:00 6600 3:30 0 15:30 7400 4:00 0 16:00 8200 4:30 0 16:30 8700 5:00 0 17:00 9200 5:30 0 17:30 9400 6:00 0 18:00 9600 6:30 0 18:30 9700 7:00 0 19:00 9800 7:30 50 19:30 9900 8:00 100 20:00 10000 8:30 150 20:30 10000 9:00 200 21:00 10000 9:30 600 21:30 10000 10:00 1000 22:00 10000 10:30 1600 22:30 10000 11:00 2200 23:00 10000 11:30 3000 24:00 10000 a) The power factor recorded is at 0.76 lagging. What is the Maximum Demand in 30 mins of the factory? (3 marks) b) Calculate the monthly utility bill (assume 30 day in month). The tariff of the utility company is, Peak Usage charge (7am to 11pm) 20 cents / kWh Off peak Usage charge (11pm to 7am) 12 cents / kWh Contracted Capacity Charge per month $8 / kW Uncontracted Capacity Charge per $11 / kW month Reactive Power Charge 0.6 cents / chargeable kVArh (5 marks) A main switch board is supplied from a 22/0.4 kV, 2,000 KVA transformer with an impedance of 6%. The impedance of LV cables to the main switchboard is 0.0005+jo.0012 2. The fault level at the intake point at 22 kV is 1,000 MVA, calculate the fault current at main switch board. (12 marks) Q2. 0 A 6.6KV Main Switch Board of a factory receive 6.6KV supply from Power Grid. The Contract Capacity is at 1500 kW. The table below shows the kWh meter readings of a typical day of the factory in a 24 hours period. Time Meter Reading Time Meter Reading (kWh) (kWh) 0:00 0 12:00 3800 0:30 0 12:30 4200 1:00 0 13:00 4600 1:30 0 13:30 5000 2:00 0 14:00 5400 2:30 0 14:30 6000 3:00 0 15:00 6600 3:30 0 15:30 7400 4:00 0 16:00 8200 4:30 0 16:30 8700 5:00 0 17:00 9200 5:30 0 17:30 9400 6:00 0 18:00 9600 6:30 0 18:30 9700 7:00 0 19:00 9800 7:30 50 19:30 9900 8:00 100 20:00 10000 8:30 150 20:30 10000 9:00 200 21:00 10000 9:30 600 21:30 10000 10:00 1000 22:00 10000 10:30 1600 22:30 10000 11:00 2200 23:00 10000 11:30 3000 24:00 10000 a) The power factor recorded is at 0.76 lagging. What is the Maximum Demand in 30 mins of the factory? (3 marks) b) Calculate the monthly utility bill (assume 30 day in month). The tariff of the utility company is, Peak Usage charge (7am to 11pm) 20 cents / kWh Off peak Usage charge (11pm to 7am) 12 cents / kWh Contracted Capacity Charge per month $8 / kW Uncontracted Capacity Charge per $11 / kW month Reactive Power Charge 0.6 cents / chargeable kVArh (5 marks) A main switch board is supplied from a 22/0.4 kV, 2,000 KVA transformer with an impedance of 6%. The impedance of LV cables to the main switchboard is 0.0005+jo.0012 2. The fault level at the intake point at 22 kV is 1,000 MVA, calculate the fault current at main switch board. (12 marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Intermediate Accounting

Authors: Donald E. Kieso, Jerry J. Weygandt, Terry D. Warfield.

9th Canadian Edition, Volume 2

470964731, 978-0470964736, 978-0470161012

Students also viewed these Accounting questions