Q2 [30 points]: Problem solving for Risk Assessment [SO: 1,2,3,4,5,6,7] . A company working in energy field is in the process of analyzing the risks

Q2 [30 points]: Problem solving for Risk Assessment [SO: 1,2,3,4,5,6,7].

A company working in energy field is in the process of analyzing the risks associated to a gas storage in power stations. It is using the evaluations and the matrix below in the process. For every part below, choose the correct option.

image text in transcribedimage text in transcribed

a- [5 points] The step of risk assessment is needed Answer

- before beginning to store the gas in power stations

-after construction of the storage gas well

-after using a stored gas in power stations

b- [5 points] The risk assessment begins with Answer

-setting up the dangers associated with a gas storage

-understanding what can be done to remove the opportunity of exposure to a risk

-analyzing how likely every potential risk is to happen

c- [5 points] The company evaluated the risk of a leakage from broken equipment that is highly likely and could cause catastrophic damage. This risk is Answer

-Unacceptable

-Significant

-Tolerable

d- [5 points] The company evaluated the risk of the property destruction as insignificant. Since this risk to be Answer

-highly unlikely and could not lead to serious injuries

-highly unlikely and could lead to fatalities

-quite likely and could lead to serious injuries

e- [5 points] After the risks have been evaluated, the company should Answer

-develop the action plan for their control

-create a list of the employees affected by them

-provide a monitoring documentation that shows the implementation results of the risk assessment process made

f- [5 points] When controlling the risks, Answer

-the leakage from broken equipment will have a higher priority than the property destruction

-the property destruction will have a higher priority than the leakage from broken equipment

-the leakage from broken equipment and the property destruction will have the same priority

1. Slight harm 2. Injury affecting work 3. Serious injury 4. Possible fatality \begin{tabular}{|c|c|c|c|} \hline 4 Tolerable & 8 Significant & 12 & 16 \\ Unacceptable & Unacceptable \\ \hline Insignificant Insignificant & Tolerable Tolerable & 9 & 12 \\ \hline 1 Insignificant & Tolerable Unacceptable \\ \hline Insignificant & Significant Insignificant & Tolerable \\ \hline \end{tabular}

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Databases questions