Q2) Consider a manufacturing company which produces n different products. Each product requires the same operation route. This route consists of three stages and
Q2) Consider a manufacturing company which produces n different products. Each product requires the same operation route. This route consists of three stages and there is a limited storage area between successive stages to keep the semi-products. Additionally, operation in a stage can be done by a number of identically parallel machines. Scheduler wants to minimize completion time of the last job. Classify this problem according to the classification scheme of scheduling (that is, a | B | Y triplet). (10p) Q3) Consider the following parts separately. a) Prove that WSPT (the weighted shortest processing time first) rule is optimal for 1 || EwjCj. (10p) b) Find the optimal sequence and objective value for the following instance of 1 ||EwjCj. (10p) J Pj Wj 12 4 7 4 14 3 4 5 3 2 2 3 363
Step by Step Solution
There are 3 Steps involved in it
Step: 1
ANSWER Q2 The given scheduling problem can be classified as a 1 B Cmax problem 1 Represents a single machine that carries out the operations for all the products B Represents the limited storage area ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started