Q2. Given a project depicted in the figure below, a. Use the window analysis method with monthly updates on the as-planned schedule to determine the
Q2. Given a project depicted in the figure below, a. Use the window analysis method with monthly updates on the as-planned schedule to determine the total delay chargeable to each of the subcontractors (equipment and piping). b. Redo part a using two-month windows and compare the results