Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Q2: Two, rectangular primary settling basins operating in parallel are to be designed to treat domestic wastewater following preliminary treatment. The average daily flow coming

image text in transcribed
Q2: Two, rectangular primary settling basins operating in parallel are to be designed to treat domestic wastewater following preliminary treatment. The average daily flow coming into the treatment plant is 10,000m3/d and the PHF:ADF ratio is 3:1. Each basin is expected to treat 75% of the peak hourly flow with one unit out of service. State regulatory requirements stipulate the maximum overflow rate must not exceed 100m3/(dm2). The detention time should be between 1 and 2 hours at the average daily flow. The maximum weir loading rate at peak flow can not exceed 350m3/(dm). Determine the dimensions (L,W,D) of the settling basins using a L:W ratio of 4:1 to meet the design criteria. Determine the side water depth (SWD) to meet the detention time requirements. Calculate the weir length necessary to meet the weir loading condition established by the regulatory agency

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Principles And Modern Applications Of Mass Transfer Operations

Authors: Jaime Benitez

3rd Edition

1119042739, 978-1119042730

More Books

Students also viewed these Chemical Engineering questions

Question

Are there any questions that you want to ask?

Answered: 1 week ago