Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Q4. A well 10000 ft deep is completed with a 7 casing 32 lb/ft. The well was produced with a 27/8 EUE 6.5 lb/ft, N-80

Q4. A well 10000 ft deep is completed with a 7 casing 32 lb/ft. The well was produced with a 27/8 EUE 6.5 lb/ft, N-80 tubing string into a packer (polished bore 3.25) at a depth of 10000 ft. Initially, the tubing and casing were filled with 9 ppg brine with a surface pressure of 500 psi for both tubing and casing. During the production, tubing is displaced with 30 oAPI oil with a surface pressure of 1000 psi and casing pressure of 500 psi.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started