Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Q4. A well 10000 ft deep is completed with a 7 casing 32 lb/ft. The well was produced with a 27/8 EUE 6.5 lb/ft, N-80
Q4. A well 10000 ft deep is completed with a 7 casing 32 lb/ft. The well was produced with a 27/8 EUE 6.5 lb/ft, N-80 tubing string into a packer (polished bore 3.25) at a depth of 10000 ft. Initially, the tubing and casing were filled with 9 ppg brine with a surface pressure of 500 psi for both tubing and casing. During the production, tubing is displaced with 30 oAPI oil with a surface pressure of 1000 psi and casing pressure of 500 psi.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started