Question
Q5 Mannheim Corporation manufactures small camping tents and family camping tents. Estimated direct labor time to produce each type of tent is as follows: Small
Q5
Mannheim Corporation manufactures small camping tents and family camping tents. Estimated direct labor time to produce each type of tent is as follows:
| Small | Family |
Estimated tents produced | 25,000 | 10,000 |
Direct labor hours per tent | 2 | 5 |
Estimated overhead for the period = 1,200,000 SAR.
a) Compute the overhead cost assigned to each type of tent assuming direct labor hours are used to allocate overhead costs.
The controller is not satisfied with the traditional method of allocating overhead because he believes that most of the overhead costs relate to the family tent product line because of its complexity. He therefore developed the following three activity cost pools and related cost drivers to better understand the costs.
Activity Cost Pools | Expected Use of Cost Drivers | Estimated Overhead Costs (SAR) |
Setting up machines | 1,000 setups | 220,000 |
Assembling | 90,000 labor hours | 990,000 |
Inspection | 1,200 inspections | 240,000 |
b) Calculate the activity-based overhead rates for these three cost pools.
c) Compute the cost that is assigned to each bicycle product line using activity-based costing system, given the following information.
Expected Use of Cost Drivers per Product | ||
| Small | Family |
Number of setups | 150 | 850 |
Direct labor hours | 30,000 | 60,000 |
Number of inspections | 100 | 1,100 |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started