Question
Question #1 A production line is to be designed for a job with four tasks. The cycle times are 5.4 minutes, 2.8 minutes, 3.9 minutes,
Question #1
A production line is to be designed for a job with four tasks. The cycle times are 5.4 minutes, 2.8 minutes, 3.9 minutes, and 4.7 minutes. The raw process time is ______ and the bottleneck cycle time is ______ minutes.
Question #2
Consider the following three-station production line with a single product that must visit stations 1, 2, and 3 in sequence.
Station 1 has 3 identical machines with an average processing times of 5 minutes per job
Station 2 has 10 identical machines with an average processing time of 20 minutes per job.
Station 3 has 4 machines with average processing times of 3 minutes per job.
- How long does it take for a product to go through the entire production line?
- What is the cycle time of each station?
- What is the bottleneck rate for the production line and what station is it?
- Compute w0 for production line?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started