Question 1 Below is an item from a Bill of Quantities. Number Item Description Unit Quantity Rate (USS) Amount (USS) A510.3 Prime Cost item -
Question 1 Below is an item from a Bill of Quantities. Number Item Description Unit Quantity Rate (USS) Amount (USS) A510.3 Prime Cost item - Diversion of water by NWC Sum Assuming that a trench is lm deep and 300m long has to be excavated in open ground, a new water main (material cost = US$ 70 per m) laid and the trench backfilled. As a representative of the Nominated Sub- contractor NWC: i. Prepare a method statement and a risk assessment for the prime cost item. (12 marks) ii. Estimate the cost (amount) of the prime cost item. (8 marks) [20 marks) Question 1 Below is an item from a Bill of Quantities. Number Item Description Unit Quantity Rate (USS) Amount (USS) A510.3 Prime Cost item - Diversion of water by NWC Sum Assuming that a trench is lm deep and 300m long has to be excavated in open ground, a new water main (material cost = US$ 70 per m) laid and the trench backfilled. As a representative of the Nominated Sub- contractor NWC: i. Prepare a method statement and a risk assessment for the prime cost item. (12 marks) ii. Estimate the cost (amount) of the prime cost item. (8 marks) [20 marks)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started