Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question 1 Many of today's digital or electronic devices and equipment cannot function without the use of highly complex interconnected network of generally microscopic electronic

Question 1

Many of today's digital or electronic devices and equipment cannot function without the use of highly complex interconnected network of generally microscopic electronic components.

Nano Semicon is one of the leading contract manufacturer of integrated circuits (or IC chips) manufacturer in the region. The worldwide shortage of these IC chips has put pressure on IC chip manufacturers ever increasing demands. Nano Semicon currently manages to cope with this upsurge in IC chips consumption.

Nano Semicon has already converted much of its manufacturing facility into a highly automated factory, employing robotics and artificial intelligence to handle most of the repetitive tasks. However, the factory still needs some workers to be working in shifts such as process engineers, technical support personnel, software programmers and quality control inspectors.

The factory works on a 24/7 five-shift basis. The full cycle of operations starts at 7am (or 0700) and ends at 7am the next day. This cycle is divided into 9 periods, each consisting of a two-hour duration. For example, the first two-hour period of the cycle lasts from 0700 to 0900. The details of the breakdown of the time periods as well as the minimum number of workers required per time period are given in Table 1 below.

As workers per shift are given different tasks to perform, their wages per worker varies from shift to shift. The Production Manager, together with the Human Resource Manager had worked out the cost per worker per shift. These are also given in Table 1 below. The "" symbols in Table 1 indicate the number of time periods that each shift of workers must work. For example, shift 1 workers are required to work from 0700 to 1500. (Time includes lunch of 30 minutes at 12.30pm).

image text in transcribed
Shift Time Period Minimum number of 1 2 3 4 5 Workers Required 0700 - 0900 V 32 0900 - 1100 V V 70 1100 - 1300 V A 62 1300 - 1500 V V A 55 1500 - 1700 V V A 65 1700 - 1900 V V 62 1900 - 2100 V A 70 2100 - 2300 V 35 2300 - 0700 V 15 Wage per worker 55 52 53 58 62 Table 1: Shift vs Time period

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Geometry And Analysis Of Fractals Hong Kong, December 2012

Authors: De Jun Feng, Ka Sing Lau

1st Edition

3662439204, 9783662439203

More Books

Students also viewed these Mathematics questions

Question

2. Ask questions, listen rather than attempt to persuade.

Answered: 1 week ago