QUESTION 15 Which one of the following is an example of a product-oriented layout?
a. A sit down dinner in a restaurant. b. A construction site of a large airplane. c. A salad buffet line in a resaurant. d. An assembly line for producing TVs. e. Answers "c" and "d".
QUESTION 16 The main results of MRP scheduling process are:
a. Inventory on hand, safety stocks, and net requirements. b. Net requirements, planned orders and planned order releases. c. Inventory on hand, net requirements, and planned orders. d. Safety stocks and inventory on hand. e. None of the above.
QUESTION 17 An assembly line has the following tasks with their respective task times: A = 4 min, B = 4.5 min, C = 4.5 min, D = 2.2 min, and E = 4.8 min. If the assembly line operates for 6 hours, and the required output is not given, what is the maximum possible output in this assembly line?
a. 80 b. 72 c. 18 d. 75 e. 164
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started